Goodman Logistics Center

Goodman Logistics Center

 

Project Location: 2001 East Orangethorpe Avenue at the northeast corner of the Orangethorpe Avenue and Acacia Avenue intersection and is bounded by Acacia Avenue to the west, Kimberly Avenue and BNSF railroad tracks to the north, State College Boulevard to the east, and Orangethorpe Avenue to the south. 

Project Description:  The proposed Project includes redevelopment of the Project site with an approximately 1,561,522 s.f. industrial logistics center consisting of four buildings (Buildings 1, 2, 3, and 4) on four separate lots. This includes approximately 1,456,522 s.f. of warehouse space and approximately 105,000 s.f. of office space (ground floor and mezzanine). Following is a brief description of the individual buildings.

Building 1 would be located on the western portion of the Project site, adjacent to Acacia Avenue, includes approximately 342,695 s.f. of floor area (30,000 s.f. office space and 312,695 s.f. of warehouse space), and features loading docks on the east side of the building. Building 1 does not propose any loading docks facing Acacia Avenue.

Building 2 would be located in the west-central portion of the Project site and includes approximately 545,255 s.f. of floor area (30,000 s.f. office space and 515,255 s.f. of warehouse space). Building 2 is a cross-dock building, meaning that loading docks are located on opposite sides of the building; Building 2 provides loading docks on the west and east sides of the building.

 Building 3 would be located in the east-central portion of the Project site. Building 3 is a cross-dock building that contains 495,290 s.f. of floor area (30,000 s.f. office space and 465,290 s.f. of warehouse space). Loading docks would be located on the west and east sides of the building.

Building 4 would be located on the eastern portion of the Project site, adjacent to State College Boulevard.  Building 4 includes approximately 178,282 s.f. of building area (15,000 s.f. office space and 163,282 s.f. of warehouse space).  Loading docks would be located on the west side of the building.  Building 4 does not propose any loading docks facing State College Boulevard. 

 

Public Hearings

Planning Commission 

The Planning Commission recommended approval of the project to the City Council on October 14, 2020.

 Notice of Public Hearing - October 14, 2020

Supplemental Documents

The Goodman Logistics Center Fullerton Traffic Analysis (Non-CEQA)

The Goodman Logistics Center Fullerton Traffic Analysis Appendices (Non-CEQA)

City Council

The City Council meeting is currently scheduled for public hearing on November 2, 2020. 

  Notice of Public Hearing - November 2, 2020

Environmental Documents

Notice of Completion and Availability – The City of Fullerton is the lead agency and has prepared an environmental impact report (EIR) that will address potential environmental impacts associated with the Goodman Logistics Center Fullerton project.  The purpose of this Notice is to inform agencies, organizations and interested persons that the Draft EIR is available for a 45-day public review and comment period beginning on August 4, 2020 and concluding on September 17, 2020.

Notice of Availability 

Draft Environmental Impact Report

Final EIR (including Response to Comments)

Mitigation Monitoring & Reporting Program

Draft Findings and Facts in Support of Findings

Technical Appendices:

A: NOP and NOP Comment Letters

B1: Air Quality Impact Analysis

B2: Health Risk Assessment

B3: Construction Health Risk Assessment

C: Cultural Resources Study

D: Energy Assessment

E: Geotechnical Investigation

F: Paleontological Resources Study

G: Greenhouse Gas Analysis

H1: Phase I Environmental Site Assessment (ESA)_Part 1

H1: Phase I Environmental Site Assessment (ESA)_Part 2

H1: Phase I Environmental Site Assessment (ESA)_Part 3

H1: Phase I Environmental Site Assessment (ESA)_Part 4

H1: Phase I Environmental Site Assessment (ESA)_Part 5

H1: Phase I Environmental Site Assessment (ESA)_Part 6

H1: Phase I Environmental Site Assessment (ESA)_Part 7

H2: Phase II ESA

H3: Asbestos and Lead Testing

I1: Water Quality Management Plan (WQMP)

I2: Preliminary Hydrology Report

J: Noise Impact Analysis

K1: Vehicular Miles Travelled (VMT) Assessment

K2: CEQA Support Traffic Analysis

L1: Water Supply Assessment (WSA)

L2: Sewer Capacity Memorandum

L3: Water Infrastructure Summary

Fullerton Plan EIR

Notice of Preparation and Scoping Meeting - The City of Fullerton will be the lead agency and will prepare an environmental impact report (EIR) that will address potential environmental impacts associated with the Goodman Logistics Center Fullerton project.

 Goodman Scoping Meeting Presentation (Video)

Notice of Preparation