Street Reconstruction Projects in Design

For pothole problems, please contact Public Works at 714-738-6897.

As part of our ongoing efforts to improve our streets, the City has utilized a Pavement Management Program (PMP) to manage its 66 center-miles of Master Plan of Arterial Highways (MPAH) network since the year 2000, and 224 center miles of local streets since 2011.  The MPAH roads are updated every two years and local streets every six years per Orange County Transportation Authority (OCTA) guidelines.  The City usually contracts out one to two arterial street rehabilitation projects each fiscal year and two to three phases of the residential street projects. 

Annual Street Rehabilitation Projects Selection Criteria:

  •  PCI, Pavement Condition Index Scores
  •  ADT, Average Daily Traffic
  •  Maintenance Service Orders
  •  Matching Grant Fund
  • Coincide with water, sewer and/or drainage projects
  • Participation of other jurisdictions

Residential street reconstruction or rehabilitation is currently done in conjunction with sewer and water replacement projects.  Streets that have been scheduled for sewer and/or water replacement will also be evaluated for street reconstruction or rehabilitation.  See the Sewer or Water Section for a list of current projects in design and construction.


ARTERIAL STREET RECONSTRUCTION/REHABILATION IN DESIGN

Street Limits/Location Estimated Construction Date
Berkeley Ave Lemon to Chapman July 2014
Orangethorpe Ave Magnolia to Auto Center August 2014
Yorba Linda Blvd Placentia to Bradford August 2014

ARTERIAL STREETS WIDENING IN DESIGN

Street Limits/Location Estimated Construction Date
Bastanchury Road Harbor to Fairway Isles April 2015

GRADE SEPARATION IN DESIGN

Street Limits/Location Estimated Construction Date
Raymond Ave Underpass Ash to Santa Fe May 2014
State College Blvd Underpass Kimberly to Santa Fe May 2014

Raymond Ave Project Summary pdf
Raymond Ave Project Report pdf - large file
Raymond Ave Project Report Addendum pdf

State College Blvd Public Briefing pdf
State College Blvd Preliminary Environmental Study pdf - large file
 

RESIDENTIAL STREET RECONSTRUCTION IN DESIGN

Note:
All streets may not be constructed due to funding limitations.

Street Limits/Location Estimated Construction Date
Basque Commonwealth to Amerige Summer 2014

ALLEY RECONSTRUCTION IN DESIGN

Street Limits/Location Estimated Construction Date
Various Various July 2014