Low Graphics Version Home | Contact Us | FAQs | Service Request | eLists | Site Map
City of Fullerton
Public Works
Home ... > Projects in Design > Sidewalks
Shortcuts
State College & Raymond Grade Separation Updates
Downtown
Water Bill Payment
City Employment
Agendas & Minutes
City Services
Classes
Emergency Preparedness
Online Services
Permits
Public Notices
Curb, Gutter, & Sidewalk Reconstruction Projects in Design

The Curb, Gutter, and Sidewalk Reconstruction project improves damaged and/or deteriorated concrete infrastructure for the safety of the general public.  The reconstruction locations are determined from a list compiled by the Public Works Department Engineering and Maintenance Services Divisions.  The locations with the highest rating will be the highest priority for reconstruction based on available funding.

Curb, Gutter, & Sidewalk Reconstruction Criteria:
  • The fronting residence/business/institution
  • The height of the concrete displacement
  • Tree mitigation
  • Sanitation

CURB, GUTTER, & SIDEWALK PROJECTS IN DESIGN

Street Limits/Location Estimated Construction Date
Various Various April 2014

FacebookTwitterYouTube
RSS for Fullerton NewsFullerton eLists
Home | Contact Us | FAQs | Service Request | eLists | Site Map | Disclaimer & Privacy PolicyCopyright © 2000 - 2014 City of Fullerton. City Yard, 1580 W. Commonwealth, Fullerton, CA 92833. (714) 738-6897