Low Graphics Version Home | Contact Us | FAQs | Service Request | Site Map
City of Fullerton
Engineering
Home ... > Projects in Design > Water
Shortcuts
Downtown
Water Bill Payment
Agendas & Minutes
City Job Opportunities
City Services
Classes
Emergency Preparedness
Municipal Code
Online Services
Permits
Police
Water Project in Design
Bookmark and Share

The Water Main Replacement program is part of our continuing efforts to repair deteriorated infrastructure and to provide a safe and reliable source of water for our citizens. The City replaces 1.5 miles of pipline each fiscal year. The locations are determined from a list that is compiled by the Engineering and Maintenance Services departments. Besides the water main replacement program the city rehabilitates other infrastructure such as reservoirs and pump stations on an as needed basis.

Water Main Replacement Criteria:

  • Water main break history
  • Water main material
  • Water main age
  • Undersized water main

Water Projects in Design:

  • Las Palmas Reservoir
  • Tank Farm Reservoir # 5
  • Water Main Replacement 2009-2010:

StreetLimits/LocationEstimated Construction Date
Sunset LnLoma Verde to El RanchWinter 2009/2010
Via MiradaVia Ingreso to El RanchoWinter 2009/2010
Calle AlegriaSunset to El RanchoWinter 2009/2010
El Rancho VistaVia Mirada to SunsetWinter 2009/2010

Home | Contact Us | FAQs | Service Request | Site Map | Disclaimer & Privacy PolicyCopyright © 2000 - 2009 City of Fullerton. Engineering, 303 W. Commonwealth, Fullerton, CA 92832. (714) 738-6845