The Water Main Replacement program is part of our continuing efforts to repair deteriorated infrastructure and to provide a safe and reliable source of water for our citizens. The City replaces 1.5 miles of pipline each fiscal year. The locations are determined from a list that is compiled by the Engineering and Maintenance Services departments. Besides the water main replacement program the city rehabilitates other infrastructure such as reservoirs and pump stations on an as needed basis. Water Main Replacement Criteria: - Water main break history
- Water main material
- Water main age
- Undersized water main
Water Projects in Design: - Las Palmas Reservoir
- Tank Farm Reservoir # 5
- Water Main Replacement 2009-2010:
| Street | Limits/Location | Estimated Construction Date | | Sunset Ln | Loma Verde to El Ranch | Winter 2009/2010 | | Via Mirada | Via Ingreso to El Rancho | Winter 2009/2010 | | Calle Alegria | Sunset to El Rancho | Winter 2009/2010 | | El Rancho Vista | Via Mirada to Sunset | Winter 2009/2010 |
|