This category includes projects that don’t fall under the other categories on this website. The types of projects include those located at various City facilities such as City Hall, Police, Fire, Airport, Transportation Center. Also included are bike paths. Current projects under design or planned are as follows:
| Location |
Project Description |
Estimated Construction Date |
| Transportation Center |
Video Surveillance System |
March 2012 |
| Airport |
Taxiway Rehabilitation |
Spring 2012 |
| Fox Theatre |
Public Plaza |
July 2012 |
| Airport |
Roof Replacement |
September 2012 |
| Bastanchury Rd |
Traffic Signal Syncronization |
September 2012 |
| Euclid Street |
Traffic Signal Syncronization |
September 2012 |
| Transportation Center Parking Structure Elevator |
Elevator |
October 2012 |
| Transportation Center Ped Overpass |
Elevator |
November 2012 |
| Bastanchury/Valencia Mesa |
Bike Path |
Summer 2013 |