Low Graphics Version Home | Contact Us | FAQs | Service Request | eLists | Site Map
City of Fullerton
Community Dev
Home ... > 2005 > October 6, 2005
Shortcuts
State College & Raymond Grade Separation Updates
Water Bill Payment
City Employment
Agendas & Minutes
City Services
Classes
Emergency Preparedness
Online Services
Permits
Public Notices
Staff Review Committee Meeting Minutes OCTOBER 6, 2005

COUNCIL CONFERENCE ROOM FULLERTON CITY HALL
THURSDAY, 9:00 A.M., OCTOBER 6, 2005

CALL TO ORDER:Chairman Rosen called the meeting to order at 9:10 a.m.
COMMITTEE MEMBERS PRESENT:Eastman, Petropulos Rosen, Tabatabaee, Thompson, and Voronel
COMMITTEE MEMBERS ABSENT:None
STAFF MEMBERS PRESENT:Sowers, Wolf, and Norton
OTHERS PRESENT:None

APPROVAL OF MINUTES:

September 15, 2005 minutes approved as written.

INTRODUCTIONS - COMMITTEE AND STAFF MEMBERS:

ACTION ITEMS:

PRJ05-00605 - ZON05-00079. APPLICANT AND PROPERTY OWNER: STEPHEN PRECIADO. A request to reduce the side and rear yard setback requirements for a garage and workshop addition on property located at 629 Golden Avenue (west side of Golden Avenue, approximately 425 feet north of the centerline of Malden Avenue) (R-1-7.2 zone) (Categorically exempt under Section 15301 of the EQA Guidelines) (JE)

The applicant was present to discuss his plans.

The project was presented by Senior Planner Jay Eastman. The applicant is proposing to construct a new garage with an attached workshop/storage area. The storage does not have a wall separating the two spaces. The City's Code allows for structures that are less than 600 square feet and non-habitable and less than 10 feet in wall height to be built up to the property line. If greater than 600 square feet then a Minor Site Plan Review is required. As proposed the structure covers the full width of the rear yard and is within 3-feet of the property line. It does not appear that a lot coverage analysis was completed. The calculations would be verified during the Plan Check Review. Staff received no calls from neighbors in opposition to the project.

Committee Members suggested modifying the roof pitch to reduce the height on the back side by running the ridge all the way across the building with a small gable at the top. Other options were suggested to reduce the height of the roof at the rear property line.

Fire comments were submitted via memo (in file) dated October 3, 2005.

MOTION to approve, SECONDED and CARRIED unanimously to APPROVE PRJ05-00605 - ZON 05-00079 subject to the conditions below. (Resolution No. 430)

  1. Revise roof pitch to slope away from the rear property line.

  2. Final building plans shall comply with Building Code setback requirements and Zoning Code, including lot coverage prior to issuance of permits. That all corrections generated through the plan check and inspection processes are incorporated by reference as conditions of approval and would include any requirements generated by the Engineering, Planning, Building and Fire Departments.
There is a 10-day appeal period where any action by this committee can be appealed to the Planning Commission and ultimately to the City Council.

ADJOURNED AT 9:30 A.M. AS STAFF SITE PLAN REVIEW COMMITTEE:

FacebookTwitterYouTube
RSS for Fullerton NewsFullerton eLists
Home | Contact Us | FAQs | Service Request | eLists | Site Map | Disclaimer & Privacy PolicyCopyright © 2000 - 2014 Community. Development, 303 W. Commonwealth Ave., Fullerton, CA 92832. 714-738-6547